Applying for a Building Permit
Before starting any kind of construction on your property, it is best to discuss your plans with the planning staff before you begin your project. This ensures that your project avoids any unnecessary fees and will help to determine if your project complies with the comprehensive zoning bylaw. For your convenience, please refer to the preliminary checklist.
Cloudpermit (New e-permitting system) |
||||||||||
This online tool allows you to see the status of your application anywhere, anytime. You will receive updates by email on the status of your permit application throughout each stage of the application process. Follow the steps below or watch this instructional video - how to submit a building permit For assistance or technical support please visit: https://support.cloudpermit.com/support/home
|
Permit Information
Why do I need a building permit? |
A building permit regulates development by protecting individuals and the community of the Town of Gravenhurst by meeting health, fire, structural and general safety standards. It is illegal to conduct work without a permit and is against the Municipal Building By-Law and the Ontario Building Code Act. |
When is a building permit required? |
Accessory structures less than 10 metres squared do not require a permit provided they are not attached to another structure. As of April 29, 2022 - A shed is exempt from the requirement to obtain a permit under section 8 of the Act and is exempt from compliance with this Code, provided that the shed, (a) is not more than 15 m2 in gross area; (b) is not more than one storey in building height; (c) is not attached to a building or any other structure; (d) is used only for storage purposes ancillary to a principal building on the lot, and; (e) does not have plumbing If you are unsure if your project requires a permit please contact the Building Department. If you commence construction without a building permit you are subject to increased fees. All structures on a property are required to comply with zoning. Dark Sky Bylaw Sign Bylaw Other ApprovalsPrior to submitting your building permit, make sure you have any required approvals from other agencies such as:Property ownership – deeded ownership, conveyance/severance complete. Ministry of Transportation Building Land Use Entrance Permit, 1-800-255-7814 Ministry of Environment, 1-800-890-8511 Simcoe/Muskoka District Health Unit (for a water testing kit), 705-684-9090
|
Information Required when Submitting a Building Application? |
||
When submitting your application electronically, make sure you include the following:
|
||
Permit Application Forms (if unable to submit electronically) |
||
Building Information Packages |
||
These packages provide information on a variety of construction projects. If you have further questions, please contact the Building Department at 705-687-3412.
|
How long is a building permit valid? |
The construction of your approved project should start within the first 6 months from the date the permit was issued. Should a permit remain open after three years a maintenance fee along with a surcharge will be applied annually until it is closed. |
Building Permit Fees
Fees for building permits vary depending on the type of work required
Fees and costs associated with a building permit application |
For further details on the fees and costs associated with a building permit application, please review the (Schedule) Building permit fees. When developing a property please review the development charge bylaws for both the Town of Gravenhurst and District of Muskoka as these fees may be applicable to your project. For further details please review the Development Charges. |
Building Inspections
Your building permit will contain all the inspections that are required for your project. You may call the Building Inspection line at 705-687-3412 ext. 2263 or book an inspection online allowing 48 hour notice in advance.
When to request building inspections |
For further details please click on this link for types of inspections that may be required according to your construction project |
Building inspections requirements and lists |
Please provide the following information when calling in your request (705) 687-3412 ext. 2263:
|
Types of Inspections |
(Please note: Some requirements may vary based on the origin of permit) |
Water Travel Form |
A water travel form is required to be completed for properties limited to water access only. The form is required to be submitted prior to the arranged inspection date. The water travel form can be completed and submitted below. |
Cold Weather Requirements for Construction Sites
Cold weather requirements are important to follow because it allows concrete to properly cure and achieve its proper compressive strength. For further details please review the cold weather requirements for concrete
Construction Sites and Workers
All construction sites and workers shall comply with the appropriate sections of the Occupational Health and Safety Act with regulations for Ontario.
What you need to know about worksite health and safety |
For further details please review the worksite health and safety information sheet |
Liquor Licence Application
Liquor Licensing in Ontario is monitored by the Alchol and Gaming Commision of Ontario (AGCO).
What you need to know about the liquor license process |
In order to receive a liquor licence for your establishment, the Municipal Information Form included in the application package provided by the AGCO must be filled out and provided to the Legislative Services Division. In addition to the above noted package the liquor licence application form along with the applicable fee is to be submitted to the Building Divison. The cost of the letter and inspection is $110.00 to be paid to the Town of Gravenhurst Building Department prior to the scheduled inspection. Any questions you may have can be directed to the Building Department at 705-687-3412, ext 2255 Andy Jones, Chief Building Official. |
Special Event Temporary Tent
Temporary structures such as tents, may require a special events permit
What you need to know about special event temporary tent applications |
A permit is required if the structure exceeds 60 square meters A fully completed application for a permit to construct along with following information: Applicable permit fee Site plan drawings with location of existing structures, proposed tent(s), including distances from structures, water bodies, property lines and septic bed and septic tank Location and number of exists Provide proof of Flame Resistance Rading (provided by tent supplier) For further details please review this information package, Special Event Temporary Tent |
Summer Septic Re-inspection
Our summer septic re-inspection program is to help keep our lakes and ground water pollution-free. Gravenhurst staff work with property owners to provide information and increase awareness about their sewage disposal systems.
Summer Septic Re-inspection Program |
||||
The way you maintain your septic system will impact the longevity and on-going use of the system. If you don't maintain and inspect your sewage disposal system, it can have a negative effect on the environment. Summer student(s) carry out the re-inspection program from May until late September. They look for visual signs that your system may need attention.
|